Frequently Asked Questions

Category : PEC Mfg. Co

What testing is done before dispatch?

Each resistor undergoes thorough testing, including:

  • 100% Resistance value verification
  • Batch Tests to check Visual & Dimensions Criteria
  • Batch Tests to Check Solderability where applicable.
  • Type Tests for Load and Overload Performance
  • Batch Tests to check Insulation resistance
     

This ensures performance consistency and long operational life. Our products are designed for extreme long life required in infrastructure projects like Traction (Railway), Power Plants, Renewable Energy Generation.